Compare

Production Board: the alternative to Linear

What moving from Linear to Production Board actually looks like in 2026.

Switching
Productivity
Finn Glas
Finn GlasCo-Founder + Engineering
·April 16, 2026·
1 min read

Production Board is what people use when Linear stops fitting. Below is the honest side-by-side - same product surface, different posture: hosted in Germany, no third-party trackers, one honest price - plus the migration mechanics that decide whether the switch lands in an evening or in a quarter.

At a glance

Linear is the canonical engineering issue tracker - sharp UI, opinionated workflow, clean cycles. Production Board uses the same posture for production work: phases instead of cycles, durations instead of estimates, owners-per-phase instead of assignees. Pick Linear for software teams; pick us for production teams.

Switching

What moving from Linear actually looks like

The switch goes in three rough phases: export from Linear, import into Production Board, and reorganise what came over. Most people allocate an evening for it. The export side is where the time goes - Linear hands you a CSV/JSON dump and the field mapping isn't always obvious; once that's resolved the import is a couple of minutes. We don't paywall the import path or pretend it's a pro-only feature, and you can run both side-by-side while you decide.

Production Board vs Linear: feature comparison

Ours
Production Board
Theirs
Linear
Engineering issues
Production phases
Per-phase durations
Cycles + sprints
Hosted in Germany

When to pick which

Pick Production Board when

Your team ships physical or production work, not software.

Pick Linear when

You're a software team.
Step by step
1

Export from Linear

Find the export option in Linear's account settings. Most tools provide a CSV or JSON download. Save the dump locally - that's the source of truth for the next step.

Account settings → Export / Download data
Pick the broadest format the tool offers (usually JSON)
2

Map fields in Production Board

Open the import tool in Production Board. Linear's field names rarely match Production Board' 1:1; the import flags any unmapped columns so you can pair them up before anything commits.

Account settings → Import
Resolve the mapping prompts the tool surfaces
3

Run the import

Run the import. Production Board shows a preview of the first parsed rows in the import dialog so you can sanity-check the column mapping + a sample of records before anything commits. If you're nervous about a large dump, import a small subset first, verify it landed the way you expected, then run the full file.

4

Re-create your views, tags, saved searches

Linear-specific UI metadata (custom views, saved filters, in-app annotations) doesn't transfer with the data export. Spend an evening rebuilding the views you used most - usually a 30-minute job once you've done it once.

5

Cancel Linear when you're confident

Run both side-by-side for a couple of weeks if you want to be sure. When you're confident, cancel the Linear subscription from their side. Production Board keeps your export option self-serve in account settings - no lock-in either direction.

Switching from Linear

The five questions we get most often before someone moves their data over.

Start with Production Board

Free plan, no credit card. We host in Germany. Export + delete are self-serve.

Finn Glas

Written by

Finn Glas

Co-Founder + Engineering

Finn is one of the Co-Founders. He owns the engineering side, the infrastructure, and most of the late-night fixes that ship before anyone notices.

finn.glas at aicuflow dot comLinkedInWebsite